Before isolation:
Plastering the basement floor until the demarcation block appeared and making the cement corner on the circuit from the bottom
The basement is completely dry from water and moisture
The basement is free of any obstacles that prevent the implementation of insulation
Material - Manufacturer Bitumat Dermapet Insulators
Solution 1 Poly Flim (two layers) Dermapet 4170 (two layers) Py40E250 (two layers)
The second solution is Fiberlon (two layers) asphaltoplast (two layers) Desert Shield
Bitutect Armoproof Protection M.S
note :
Zamil Company recommends and guarantees to choose the first solution
Basement walls:
Work steps :
Paint a base coat of primer
Installing an initial layer of insulation by welding 10 cm crosswise and 15 cm long, in a period of three days.
Installing a protective layer for a bituminous or fiberboard lining block within two days.
After isolation:
Pour the protective layer on the floors with a thickness of at least 5 cm within 24 hours after the completion of the insulation and before the blacksmith goes to work on the site.
Not to install nails for carpentry strings that reach the insulation in the floor, as well as fixing any nails in the insulation on the marking block.
It is very important to maintain the insulation tip on the back of the block with a width of 20 cm so that it is not cut or poured bases on it, and it is preserved with a concrete mixture until the walls are isolated.
To equalize the groundwater pressure from below with pressure from above, a slab of reinforced concrete must be made for the entire basement floor by the client.
Not to test the basement until after the reinforced concrete floors of the basement are poured from the inside, with a thickness of not less than 25 cm, and an iron grille is placed in it.
When there are modifications or extensions in the basement, it is necessary to make a hole in the insulation, so coordination with us must be taken to take the necessary precautions, and the second party should not be responsible for any damages to the insulation
M.S Note:
Zamil Company recommends and guarantees to choose the first solution
Basement walls:
Work steps :
• Paint a base coat of primer
• Installing a first layer of insulation by welding 10 cm crosswise and 15 cm long, over a period of three days.
• Installing a protective layer for bituminous or fiberboard lining blocks within two days.
After isolation:
• Pour a protective layer on the floors with a thickness of at least 5 cm within 24 hours after the completion of the insulation and before the blacksmith goes to work on the site.
• Not installing nails for carpentry strings that reach the insulation in the floor, as well as fixing any nails in the insulation on the marking block.
• It is very important to maintain the insulation tip on the back of the block with a width of 20 cm so that it is not cut or poured bases on it, and it is preserved with a concrete mixture until the walls are isolated.
• To equalize the groundwater pressure from the bottom with pressure from the top, a slab of reinforced concrete must be made for the entire basement floor by the client.
• Do not test the basement until after the reinforced concrete has been poured for the basement floors from the inside, with a thickness of no less than 25 cm, and an iron grille is placed in it.
• When there are modifications or extensions in the basement, it is therefore necessary to make a hole in the insulation, so coordination with us must be taken to take the necessary precautions, and the second party should not be responsible for any damages caused to the insulation.